Direct naar hoofdinhoud

Offshore PVD installation projects Oslo harbor

With an installation depth up to 30m, we installed PVD on several projects in Oslo harbour, amongst which the opera house. In 2006 a phase with in total 65.000m1 of prefabricated vertical drain installed from a barge was completed

PVD installation is part of our segment consolidation.  

Gerelateerde projecten

P1070065

Vacuum consolidation for Eastern Access Route IJburg (OOIJ), Amsterdam

We installed our BeauDrain and BeauDrain-S vacuum consolidation methods on an area of 50.000m2 up to a depth of 7.0m in 2012 on this project

P1060456

Vacuum consolidation trial Tuas view A3A, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 5.000m2 up to a depth of 24m in 2010 on this project to investigate the depth effect of the vacuum system.

International_cruise_terminal_singapore_7

Vacuum consolidation for the international cruise terminal, Singapore

We installed our BeauDrain-S vacuum consolidation method on an area of 6.000m2 up to a depth of 30m in 2010 to limit the effect of surcharge on piles 

Markermeerdijken_6

Vacuum consolidation trial Markermeerdijken

We installed our BeauDrain-S vacuum consolidation method and Liner vacuum method on an area of 450m2 up to a depth of 7m in 2016

IMG_3909

PVD installation for Treasure Island, San Francisco

Our heaviest rig was used to install PVD's up to a depth of 50m without predrilling through very dense sands

IMG_0883

BeauDrain-S installation for dike reinforcement project Hoekse Waard Noord

We installed BeauDrain-S drains without vacuum preloading for draining a specific layer for a dike reinforcement project in The Netherlands.