Cofra Chemia has executed the compaciton for the Puchov railway project in 2017 Gerelateerde projecten Filter projecten (20) Sorteer op... Relevantie Alfabet Sorteer op... Relevantie Alfabet CRC compaction for the Hartel Tank Terminal We have used our CRC roller to compact backfilled material up to a depth of 3m on the Hartel Tank Termina in Rotterdam in 2019. Lees meer CRC compaction Matarbari powerplant We have executed CRC roller compaction to assure platform stability and check for soft spots on the Matarbari powerplant construction site before installation of vertical drains commenced. Lees meer CVC compaction for stability slopes We have compacted the slopes for a pipe pull in Borselle, The Netherlands, from a barge up to a depth of 30m deep Lees meer CDC compaction for Bessamer Park Sheffield, UK Cofra Ltd Compacted 11.500m2 for the development of a new warehouse in 2019 Lees meer CDC compaction for UK Battery Industrialization Centre Cofra Ltd compacted 12.500 m2 for the development of a new warehouse in 2019 Lees meer CDC compaction for the Bahrein steel factory, Bahrein Our Cofra Middle East crews compacted in 2022, 40.000m2 for the reclamation to expand the Bahrain Steel Factory. Lees meer Vorige 1 2 3 4 Volgende Lees meer Lees meer