Direct naar hoofdinhoud

Vacuum consolidation trial Markermeerdijken

We installed our BeauDrain-S vacuum consolidation method and Liner vacuum method on an area of 450m2 up to a depth of 7m in 2016

Vacuum consolidation is part of our segment consolidation.

Gerelateerde projecten

IMG1263

PVD installation for landing strip Malaga airport

With an installation depth up to 30m, we installed in 2009, 2.000.000m1 of prefabricated vertical drain

P1020271

PVD installation for road embankment Paramaribo

With an installation depth up to 20m, we installed in 2009, 300.000m1 of prefabricated vertical drain.

P1080758

PVD installation for new Istanbul Airport project

With an installation depth up to 17m, we installed in 2015, 575.000m1 of prefabricated vertical drain

P1020271

PVD installation for Bombay port India

 We installed 2.000.000m1 of prefabricated vertical drain in 1986 on this project

P1020271

PVD installation for channel tunnel

We installed 2.200.000m1 of prefabricated vertical drain in 1988 on this project

P1020271

PVD delivery for Osaka Airport

Cofra and Geotechnics have delivered 1.200.000m1 PVD for the Osaka aiport expansion project in 1992