Direct naar hoofdinhoud

Vacuum consolidation for Suvarnabhumi airport

We installed our BeauDrain-S vacuum consolidation method on an area of 400.000m2 up to a depth of 10m in 2005

Vacuum consolidation is part of our segment consolidation.

Gerelateerde projecten

P1020271

PVD installation for housing development Frankfield Loch

Cofra Ltd has installed 42.000m1 of vertical drains for a housing development in 2014. In this particular case special predrilling equipment was required to penetrate dense coarse layers on top of soft clay deposits

P1020271

PVD installation for road embankments of Gort - Tuam connection

Cofra Ltd installed 700.000m1 of vertical drains for the Gort Tuam road embankments in 2015.

P1020271

PVD installation for a road embankment in Ince Marshes

Cofra Ltd installed 40.000m1 of vertical drain for the consolidation beneath a road embnakment in 2016

P1020271

PVD installation for Perth A9 A85 Junction

Cofra Ltd installed 363.000m1 of vertical drains on the new junction of the A9 and A85 in 2016 

P1020271

PVD installation for Dalton lane, Thirsk

Cofra Ltd installed 65.000m1 of vertical drains for the Dalton Lane in 2017.

P1020271

PVD installation for A6 Randalstown diversion, UK

Cofra Ltd installed 450.000m1 for this road embankment in 2018.