With an installation depth up to 38m, we installed in 2012 and 2006, 1.300.000m1 of prefabricated vertical drains
PVD installation is part of our segment consolidation.
With an installation depth up to 38m, we installed in 2012 and 2006, 1.300.000m1 of prefabricated vertical drains
PVD installation is part of our segment consolidation.