Offshore vertical drainage, Cowes Great-Britain

  • Cofra just finished the activities for the construction of a breakwater for the coast of Cowes in England. In total 11 thousand drains are installed in offshore conditions from a 65 m wide flat deck pontoon The project is executed in close participation with several departments of Boskalis: Boskalis Westminster, Boskalis Rocks, Boskalis Offshore and Boskalis Nederland.

    The town Cowes is located at the north coast of the Isle of Wight. In preparation of the future rising of the sea level and the associated climatic conditions Boskalis Westminster constructs on behalf of the local harbour authorities a new breakwater.

    Offshore vertical drainage Cowes Offshore vertical drainage Cowes 1 Isle of Wight_09Offshore vertical drainage Cowes Offshore vertical drainage Cowes Offshore vertical drainage Cowes